Section 125.1932. Community electrical system.  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • A community electrical system shall, at a minimum, be designed, installed, operated, and maintained in compliance with the rules entitled "Electrical Lines and Equipment," being R 460.811 to R460.815 and according to the construction, installation, and safety standards of the servicing public service company. A community is responsible for installing the electrical system up to and including the meter and its disconnect in new or existing communities. In addition, all of the following provisions  shall  be complied with:

    (a)  ) Primary and secondary distribution lines shall be installed underground.

    (b)    The system shall be designed to provide, at a minimum, 100 amp service according to applicable standards.

    (c)   A home site shall have  an  approved  individual  weatherproof  meter installed. A community master meter shall not be used.

History: 1979 AC; 1998 AACS.