![]() |
Michigan Administrative Code (Last Updated: November 16, 2016) |
![]() |
Department EQ. Environmental Quality |
![]() |
Water Resources Division |
![]() |
Chapter Water Resources Protection -- Part 17. Soil Erosion and Sedimentation Control |
![]() |
Part 17. SOIL EROSION AND SEDIMENTATION CONTROL |
Section 323.1707. Application review and permit procedures.
All data is extracted from pdf, click here to view the pdf.
-
(1) A person who is designated by the county or local enforcing agency who is trained in soil erosion and sedimentation control methods and techniques shall review and approve a soil erosion and sedimentation control plan.
(2) The appropriate enforcing agency shall approve, disapprove, or require modification of an application for an earth change permit within 30 calendar days following receipt of the application. The enforcing agency shall notify an applicant of by first-class mail. If an applicant is disapproved, then the enforcing agency shall advise the applicant by certified mail of its reasons for disapproval and conditions required for approval. The enforcing agency need not notify an applicant of approval or disapproval by mail if the applicant is given written approval or disapproval of the
application in person. A permit given to the applicant either in person or by first-class mail constitutes approval.
(3) A permit that contains state prescribed information shall be used by each county or local enforcing agency and shall include any additional provisions required by the county or local enforcing agency. The permit shall be available at the site of the earth change for inspection.
(4) Upon a determination that a permit applicant has met all of the requirements of these rules, Part 91 and the local ordinance, if applicable, the appropriate enforcing agency shall issue a permit for the proposed earth change.
History: 1979 AC; 1998 AACS; 2007 AACS.