Section 325.3631. Winter occupancy.  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • An individual shall not occupy, nor shall a camp operator permit occupancy of, a shelter in an agricultural labor camp before  April 1 or after November

    15  in  any  year,  unless  the   shelter  complies     with     all  of  these   rules  that  are  not inconsistent with this rule and has all of the following items:

    (a)   A kitchen sink which is in working condition and which is properly connected to hot and cold water and to a wastewater disposal system.

    (b)   A bathing facility that is supplied with hot and  cold  or  tempered water.

    (c)    A flush toilet that is properly connected to a water and wastewater disposal system.

    (d)    Double floors, double walls or an equivalent, and interior permanent-type ceilings. Concrete slab floors are acceptable.

    (e)    A free air space, if provided under the floor, that is protected to prevent plumbing from freezing and to assist in maintaining proper  room temperature.

    (f)  Not less than 100 square feet of floor space per individual.

History: 1989 AACS.