Section 400.4605. Plan review.  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • (1) Plans and specifications shall be submitted to the bureau of fire services for review and approval prior to any remodeling in a residential group home or the construction or conversion of a residential group home.

    (2)   The plans shall comply with all of the following provisions:

    (a)    Show layout, room arrangements, construction materials to be used, and the location size, and type of fixed equipment.

    (b)       For additions, show those portions, including existing exits, types of construction, and room occupancies, which may be affected by the addition.

    (3)    The plans shall be approved in writing by the bureau of fire services before construction begins.

    (4)    The plans for residential group homes for not more than 6 residents do not require the seal of a registered architect or engineer.

History: 2015 AACS.