Section 408.11296. Maintenance and operation.  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • (1) An unauthorized employee shall not enter an acetylene generator room or house.

    (2)   Operating instructions shall be posted near the acetylene generator for ready reference.

    (3)    A batch type acetylene generator shall be flushed with water and the water supply replenished after a charge of carbide is exhausted, before additional carbide is added.

    (4)   The water carbide residue mixture shall be piped into a settling pit not a sewer pipe. Only the clear water  from  the   settling  pit  may  be discharged into a sewer pipe.

    (5)   Carbide added to an acetylene generator shall refill the  space provided without ramming the charge. Steel or other  ferrous  tools   shall not be used.

    (6)    The water chamber of an acetylene generator shall be maintained at the indicated level except when draining during a recharging operation.

    (7)   Prior to making a repair involving a source of ignition, such as welding, soldering, or other hot work, the carbide charge and feed mechanism shall be removed. All acetylene shall be expelled by completely flooding the generator with water and disconnecting the generator from the piping system. Water shall be maintained in the  generator  until    repairs are completed. Hot repairs shall not be made in a room or house with other acetylene generators unless all generators and piping have been purged.

    (8)    Whenever repairs are to be made, or the generator is to be charged, or the carbide is to be removed, the water chamber shall be filled to  the proper level.

History: 1979 AC.