    80.26. Service equipment. The enforcing agency shall approve service equipment installed, altered, or repaired before the load side of the meter is energized.

    80.26.1 Emergency service repairs. The governing utility shall be permitted to reconnect the electrical service, prior to approval by the enforcing agency, following emergency  repairs   performed  by  an  electrical  contractor  licensed  pursuant   to  the

    electrical administrative act, 1956 PA 217, MCL 338.881 to 338.892. The electrical contractor shall secure a permit within the next business day after the work is completed. This requirement is not applicable to new service connections, upgrades, structural fires, or other planned modifications.