Section 460.20307. Welding preheating.  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • Rule 307. In addition to the requirements contained in 49 C.F.R.§192.235, which is adopted by reference in R 460.20606, if preheating is required, then an operator shall monitor the preheat temperature to ensure that the required preheat temperature is reached  before  beginning,  and  is maintained during, the welding operation.

History: 1998-2000 AACS.