Section 460.871. Proration among pipe lines and fields.  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • The allowable rates of withdrawal of gas for purposes of proration among producers and among several purchasers, transmitters or pipe lines from the same field, and the  prorating   of    withdrawals   among several fields shall be subject to

    approval by the commission. It shall be the duty of the commission to determine that production from any pool or field is not abandoned or unreasonably curtailed until recovery  of   all economically recoverable gas has been assured.

History: 1979 AC.