Section 408.4302. Boiler installation.
All data is extracted from pdf, click here to view the pdf.
-
(1) A boiler shall be installed by a licensed boiler installer in accordance with the requirements of the applicable ASME code referenced in
R 408.4031 and as may be required by these rules.
(2) A boiler installer shall file welding procedure specifications and the procedure qualification reports qualified in accordance with the requirements of the ASME code, section IX, welding and brazing qualifications, with the boiler division of the department, before performing any installations requiring welding.
(3) A boiler installer utilizing welding during installation shall have welding procedure specifications, welder performance qualifications, and a quality control manual or procedures to be used or which were used in the conduct of the installation available for the inspector's review.